Solar Power is arriving at CSAAC! On January 22, 2019, the solar project, Phase I started at the Community School of Maryland. Craig Pardini, Director of Infrastructure Operations, developed the concept of moving CSAAC to solar energy. Phase I will give CSAAC a $5K savings per year on its energy costs or $200,000 savings over 30 years. Part of the solar project includes 2 electric vehicle charging stations. This savings does not include gas savings on future electric vehicles soon to come and solar expansion across other CSAAC properties with Phase II. Both Craig Pardini and CSAAC’s Executive Director, Eric Salzano, are closely overseeing this project.